Previously Studied Alternatives
As part of the Casa Verde Way/ Rec Trail Crossing Study, several alternatives were studied including an underpass, overpass and at-grade crossing. The overpass and underpass alternatives per dismissed primarily due to cost, other concerns include flooding from storms, sea level rise, and additional maintenance cost from large structures. These alternatives were found to not be feasible and therefore not included in the grant funded project.
Alternative 1A - Accessible Overpass
Alternative 1B - Overpass with Separate Accessible Route
Alternative 2A - Accessible Underpass
Alternative 2B - Underpass with Separate Accessible Route